Showing posts with label corrugated steel. Show all posts
Showing posts with label corrugated steel. Show all posts

Monday, 8 September 2014

Can we make a pig ark from stock items?

Our elder daughter has moved to a house high on a valley-side above Cardiff.  As well as taking on a barn conversion, she, her husband and their son now have a stable block and 5 acres of sloping land.  Their first new venture is to keep pigs - 3 weaners which will go to the abattoir in about 6 months' time, but not before they have prepared plenty of ground for next year's fruit and vegetable growing.

The electric fencing was ordered and I offered to knock up a pig ark for them.  It was a disadvantage that we live 4 hours away as I wanted to make the ark at home.  I decided to go for a flat-pack pig ark and trust to my roof bars for transportation.  Somehow we ended up adding a kingsize mattress for the journey so with the plywood pieces, corrugated steel, oak skids and softwood roof struts we produced a sandwich-style roof-load.


I'm not sure that this load was within the manufacturer's recommendations.  I did take particular care on the drive.  Rarely have I negotiated bends and roundabouts with such care.  We arrived safely and after unloading I set about the final construction.  I had found some nice pieces of oak left over from our roof rebuild a few years ago, and they went onto the underside of the base to act as skids which will allow the ark to be moved around.


With two side struts added, the base was carried up to its first home in the lower field.


The end pieces each came out of half a sheet of 18mm ply, with a bolt-secured door.


The roof struts which, like the corrugated steel, were leftovers from our old postbarn, were friction fitted to the ends.


My charming assistant, who unwisely likened herself to Debbie McGee, held the bag of roofing screws. This was a big help as the three sheets of corrugated steel seemed to have minds of their own.


So there we were.  I had to buy the plywood and the bolts, but all the other bits came from stock.


Our grandson approved.  In fact he seemed interested in moving in.  If he does he won't have long.  The piglets arrive in about 10 days.


Wednesday, 30 January 2013

More about water

Some time ago I mentioned the unusual hybrid system we have for delivering mains water to the house and cottage here.  In recent days we have had a rash of problems, caused we believe by high rainfall sincethe start of last summer, aggravated by snow melt last week.  The pumphouse was built about 30 years ago and it was not considered necessary then to waterproof the concrete slab which forms its roof.  When things get really wet outside (and they have) things inside get wet too, as water seeps through the slab.  This is not good for the complicated electrics which control the pump.

So yesterday we woke up to no electricity in the house or cottage because the RCD on the pumphouse supply had tripped the whole system.  We also had no water as the pump was obviously without power.  I isolated the pumphouse circuit and got the rest of the electric supply back first, then went down to the pumphouse for the first of many visits.  In spite of the fact that the electrics are protected by sheets of polythene, the distribution box and the connections on the pump were running with water.  No surprise that the RCD had tripped then.  An hour or so of drying everything out did the trick, and we had water again.

Through the day I plotted (waterproofing the pumphouse having been on the 'Big Jobs' list for 2 or 3 years) and decided on two courses of action.  One was to put aside today to take some of my stock of corrugated steel panels and lengths of telegraph pole (salvaged from the old post barn) down to the pumphouse and construct a ground level 'roof' to keep the rain out.  The second was to contact Welsh Water to ask whether it might be possible that improvements in their infrastructure over the last 30 years mean that they now have enough pressure in their pipes to bring water up to the house without the need for our pump.  WW have a good website so I completed an online form asking the question.

Then, just for a laugh, after our evening meal we ran out of water again.  No problem this time with the electricity supply, but another trip down to the pumphouse with the multimeter to see what was going on.  The mains switch on the distribution board had 240 volts incoming, but 8 volts on the other side of the switch.  Damp again.  Some vigorous switching created a working connection.  Water again, and, fingers crossed, we have had water since.

This morning brought a really efficient response from Welsh Water and an appointment for an engineer to visit next Monday.  Fingers crossed.  However, deciding that crossed fingers were not enough with more rain forecast, we set off with the materials in the trailer to take the Subaru through the fields and down to the pumphouse.  Mistake.  We got stuck.  Having disconnected the trailer, I just managed to get the Subaru back to 'dry land'.  Liz bravely helped me push the trailer back, though a tow was needed for the last 20 yards or so to get it through the gloop.  A bit of a wasted morning.  So after lunch we man/woman handled the materials down to the pumphouse and I set about digging down to the concrete slab to fix the poles and steel sheets.  As dusk fell the last bolt went in and I made my 6th climb of the day back to the house.  Tired is a polite description for how I felt.  So now the pumphouse looks like this:


(it has a few stones on top for fun) and we are hoping that we get good news from the Welsh Water man next week. Chances are, though, that the pressure won't be enough and we will then go for phase two - a dehumidifier in the pumphouse with some background heating to keep it working efficiently.  We are going to get this problem sorted!